Situation
A Hyundai plant power distribution upgrade required robust cable and grounding solutions to meet demanding site standards.
Action
FRM recommended specific LS Cable & System USA medium voltage cables, coordinated engineered Milbank meter enclosures, and planned nVent Cadweld and Erico systems to ensure optimal grounding and bonding.
Impact
- Verified reliability under load conditions
- Comprehensive site compliance with utility specs
- Contractor and owner confidence increased
Delivered Value
FRM’s industry-specific expertise ensured the right products were selected for performance, safety, and long-term service life.
More Case Studies
View All Case Studies
