Hyundai Power Plant

Location

Montgomery, AL

Situation

A Hyundai plant power distribution upgrade required robust cable and grounding solutions to meet demanding site standards.

Action

FRM recommended specific LS Cable & System USA medium voltage cables, coordinated engineered Milbank meter enclosures, and planned nVent Cadweld and Erico systems to ensure optimal grounding and bonding.

Impact

  • Verified reliability under load conditions
  • Comprehensive site compliance with utility specs
  • Contractor and owner confidence increased

Delivered Value

FRM’s industry-specific expertise ensured the right products were selected for performance, safety, and long-term service life.